Boberg Diversion Structure Manhole Replacement (#2100)
Project consists of furnishing all materials, labor, equipment, and supervision for removal of the existing sanitary sewer manhole, construction of a new sanitary sewer manhole including a compound sharp-crested weir fiberglass channel and inside drop assembly, bypass pumping, PVC piping to connect to existing mainline, asphalt concrete pavement roadway restoration and associated striping, traffic control, erosion control, and performance of such additional and incidental work as called for by the Specifications and Contract Documents.
Bid Results:
- Pleasant Hill Development Company, LLC - $79,500
- Clackamas Construction, Inc. - $89,200
- Elk Mountain Construction, Inc. - $128,400