Skip to page body Home About Community Living Doing Business Browse by Topic I Want to... Your Government Your Government

Transportation Systems Plan

Text Size:Font Size Up Font Size Down

Murase Plaza Walkway

Updated 2006 

Chapter 5: Bicycle and Pedestrian Master Plan
Adopted December 2006 (Replacing the 2003 Chapter 5: Pedestrian and Bicycle Facilities)

Chapter 1:

Executive Summary and Introduction

Chapters 2, 3:

Recommended Bicycle &Pedestrian Network Plan Implementation and Phasing (3 MB)

Chapters 4, 5:

Recommended Bicycle and Pedestrian Programs Existing Conditions (2 MB)

Chapter 6:

Key Challenges and Opportunities (3 MB)

Chapter 7:

 Design Standards and Guidelines (2 MB)

Appendices:

A. Project Costs
B. Trail Development on the Willamette River
Bicycle and Pedestrian Off-Street Capital
C. Improvement Plan

 
 (Back to the Transportation Systems Plan page)

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download WinZip Download Word Viewer Download Excel Viewer Download PowerPoint Viewer
Last updated: 6/16/2010 2:42:40 PM