Charbonneau High Priority Utility Repair

ProjectLocationMap
This project addresses repair and replacement of deficient wastewater, storm drainage, drinking water, and street facilities within Charbonneau in accordance with the Charbonneau High Priority Utility Repair.  Phase 2 of the project involves the repair and replacement of the High Priority Spot Repair wastewater and storm drainage projects.

Staff Contacts


Staff can be reached via telephone at 503-682-4960
Images
  • N/A

Project Information


  • Design Engineer:   Wallis Engineering
  • Contractor:   Moore Excavation, Inc. 
  • Funding Source: Wastewater, Storm, Water & Street Operating Funds
  • Capital Improvement Project #:  2500 & 7500 

Project Status


  • Monday, July 24 thru Thursday, July 27 - Street cutting (all locations).
  • Tuesday, July 25 thru Thursday, July 27 - Open trench pipe and replace manholes (Fairway Drive).  
  • Friday, July 28 - Open trench pipe (Louvonne Drive) tentative start.
Engineering:
  • N/A